Nguu Secondary School Rainwater Harvesting and Sanitation Project



Water Point
Project Features
   
Click icons to learn more


Country:
Kenya

Program:
Kenyan Rainwater Harvesting

GPS:
Latitude -2.07
Longitude 37.64

Impact:
260 Served

Project Status:
Installed


Take a Tour




 

 



Explore The Project

Stories and Community Profile

This project is a part of our shared program with Africa Sand Dam Foundation (ASDF). Our team is pleased to directly share the below report (edited for clarity, as needed).

Background Information

Nguu Secondary School is found in Kwa Mukanda village, Nthunguni Sub-Location, Nguu Location, Nguu Division, Nzaui District of Makueni County. The school was established in 2007.

The school has a total population of 244 students (110 boys and 134 girls), 11 teachers (7 males and 4 females), 5 sub-ordinate staff (3 males and 2 females).

It is closely related with Kwa Munyaka self-help group which ASDF started to support in 2013. The self-help group (SHG) comprises of 14 members (11 males and 3 females) who are from 14 households (average household membership in the area is 6 members per household).So far the SHG has constructed 2 sand dams in their area of operation.

Water Situation in the School

The school is situated in the semi -arid and arid lands of Makueni County which are characterized by bi-annual rains in November/December (short rains) and March/May (long rains) resulting in long dry periods throughout the year.

On average the school requires 3000 liters of water per day, which is used for cooking, drinking and washing by the students who board at the school. 90 students board at the school both boys and girls.

The current water source for the school is piped water from Mukame wa Mbeu Water Project that is not 100% reliable. The pump often breaks down thus making the school to look for alternative means of collecting water.

When the pump has a mechanical problem the school buys water from water vendors who use donkeys to fetch water from an earth dam which is 1 kilometer away from the school.

The school spends KES 20,000 (about $190) monthly in paying for the water bill that is piped in the school.

The school also does roof catchment harvesting of rain water into a 10,000 liters plastic tank.

The water in this structure lasts for 2 weeks only. The current project will add a much larger tank, allowing the school to store much more water for the dry seasons.

Sanitation in the School

Latrines that exist in the school consist of 5 doors and a urinal for boys, 5 doors for girls and 2 doors for teachers.

Only one hand washing facility exists in the school and is used by the teachers.

Water-Related Challenges in the School

The water related challenges outlined below are experienced in the school and especially in the driest months of the year when harvested and stored water is exhausted.

– Water is rationed for the school to maximize 3 liters per student thus straining the students affecting the performance of the students.

– The cost of buying water is high and it is included in the school fees for parents to pay.

– Cleanliness is compromised, especially washing classrooms and other hygiene practices.

Project Results:

Rainwater Harvesting Tank

The community and school petitioned for ASDF to come in and ascertain the water and sanitation need. When our partner arrived, they conducted meetings with the school management committee to spell out the role of the school and greater community, along with the materials that should be mobilized before construction could begin.

Local material collection was conducted from September to November. Construction for the 190,000 liter tank began by mid-November, with a projected construction period of 21 days.

The school management committee also mobilized parents to work as unskilled laborers on the tank. At least 15 parents showed up each construction day, supporting the ballast and cement mixing as well as other tasks. The tank was completed on December 16, 2015.

A local member of parliament also supported the school during this project. They chose to install a 10,000 liter plastic water tank, but the piping and gutters have not yet been installed. At the time of our partner’s visit, they realized there has been no opportunity for this tank to collect water. We hope that pipes will be installed before the rainy season is over!

Hand-Washing Station

Please notice that a hand-washing station was also installed for students in the latrine vicinity. When students return from holiday vacation, they will be trained on how to use and maintain their new facilities. There are reminders painted on the side of the hand-washing station that tell students the most important times to wash their hands.

The Water Project and Nguu Secondary School Thank You for unlocking potential.


Project Photos


Recent Project Updates


12/22/2015: Nguu Secondary School Project Complete

We are very excited to report that, thanks to your willingness to help, the students and staff of Nguu Secondary School in Kenya have a new source of safe, clean water. A new rainwater harvesting system has been built by our partner and the students’ parents. A hand-washing station has been installed, and the students and community will receive training in sanitation and hygiene. Just imagine the difference these resources will make in the lives of these students! We just updated the project page with the latest details, including pictures. Note that students are on their holiday vacations, so we plan to return in January when students are back in class and using their new resources.

The Water Project and Nguu Secondary School Thank You for unlocking hope and joy this holiday season!


The Water Project : kenya4450-48-flowing-water


12/14/2015: Nguu Secondary School Project Update

We would like to inform you that construction for a rainwater harvesting tank and VIP latrines at Nguu Secondary School are in progress. It is a very busy season both here and in Africa, so we expect reports to come in over the course of next week. You will also receive an update in January when we get more pictures of the Nguu students who are currently away enjoying their holiday vacations! We look forward to touching base again when construction is complete. Thank you for your patience, and have a Merry Christmas!

The Water Project and Nguu Secondary School Thank You for graciously being a huge part of this project.


The Water Project : kenya4450-30-students


09/25/2015: Nguu Secondary School Project Underway

We are excited to announce that, thanks to your willingness to help, Nguu Secondary School in Kenya will soon have a new source of safe, clean water. A rainwater harvesting system is being constructed and the community will receive training in sanitation and hygiene. Together these resources will go a long way toward stopping the spread of disease in the area. We just posted an initial report including information about the school and pictures. As soon as we have them, we will add GPS coordinates as well. We’ll keep you posted as the project continues.

Take a look, and Thank You for your help!


The Water Project : kenya4450-30-students


Monitoring Data


Project Type:  Rainwater Catchment
Location:  Central Kenya
ProjectID: 4450
Install Date:  12/16/2015

Monitoring Data
Water Point:
Functional
Last Visit: 12/21/2017

Visit History:
04/15/2016 — Functional
12/06/2016 — Functional
12/09/2016 — Functional
06/04/2017 — Functional
09/06/2017 — Functional
12/21/2017 — Functional




Country Details

Kenya

Population: 39.8 Million
Lacking clean water: 43%
Below poverty line: 50%

Partner Profile

Africa Sand Dam Foundation (ASDF) supports self-help groups to harvest and conserve water through construction of sand dams & shallow wells, rock catchments and school roof catchments.